Expertise

Where plastic parts fail, we’ve already been.

Our practice areas map one-to-one onto the failure modes that end programs: the snap that cracks, the stack-up that won’t close, the resin that creeps, the part that won’t mold. Pick your problem below.

Practice areas

Six failure modes. Six practices built around them.

Each practice area is taught in the seminars, encoded in ChatETS and available as a senior-engineer engagement.

SF

Snap-fit & fastening

Cantilever, annular and torsional snaps; screw bosses, inserts, press-fits and welding. Retention force, assembly strain and what happens after 1,000 cycles.

  • Strain-limited arm design
  • Boss root & thread design
  • Joining method selection
TS

Tolerance stack-up

Assemblies that close on paper and gap in the vehicle. Shrink, warp and thermal expansion folded into the stack before it becomes a squeak, rattle or leak.

  • Shrink & warp allowance
  • CTE mismatch
  • Datum strategy
CR

Creep, fatigue & ESC

The time-dependent failures a short-term test misses: parts that relax, crack under chemicals, or fatigue under vibration long after PPAP.

  • Long-term load design
  • Chemical exposure risk
  • Cyclic loading
MT

Moldability & tooling risk

Wall, draft, ribs, gates and undercuts reviewed against what the mold will actually do, before slides, lifters or a re-cut are needed.

  • Gate & weld-line placement
  • Undercut strategy
  • Sink & void prevention
SR

Supplier & process risk

When the part was right but the supply chain changed: resin substitutions, process drift and quality escapes traced to cause.

  • Material substitution review
  • Process-window audit
  • Quality-escape analysis
CA

Corrective action

Containment and permanent fixes your team can execute, documented well enough to close the 8D and defend in a dispute.

  • Root-cause documentation
  • Containment plans
  • Design change validation
Tolerances, creep and chemistry don’t care how good the CAD looked.
Lesson from four decades of failure investigations

Next step

Name the failure mode. We’ll name the fix.

Describe the part and the symptom. A senior engineer replies within one business day.

  • NDA on request
  • Senior engineer replies in one business day
  • Fixed price where applicable
  • Your data stays yours