Preliminary Design Checklist |
Part Name
|
Company
|
Drawing Number
|
Part Function
|
Operating Conditions |
Normal | Maximum | Minimum | |
Operating Temperature | |||
Service life | |||
Loads | |||
Load time on | |||
Load time off | |||
Other (chemical, moisture, impact, stall, etc.) |
Environment |
Chemical | Moisture | Temperature | Sunlight direct | Sunlight indirect |
Design Requirements |
Safety Factor | Tolerances | Decorating | Assembly | Sag | Finish | Other |
Performance Specifications |
|
Other |
|
©2024 ETS Inc. All rights reserved.